Speak directly to your contact person
+31 6 27 44 20 13WhatsAppEmail

Demolition · throughout the Netherlands

Controlled demolition as a strong start to your renovation.

From stripping a room to carefully removing partitions, floors, sanitaryware and finishes.

Safe and controlled

Remove what must go while protecting what stays.

We review structure, services, access, dust control and waste handling before work begins.

Suspected asbestos-containing material or structural changes require appropriate surveys and specialist advice before work starts.
Strip-out

Remove wall, ceiling and floor finishes.

Bathroom & kitchen

Controlled removal of sanitaryware, tiles, cabinets and service elements.

Partitions

Remove non-load-bearing elements after reviewing the situation.

Ready for rebuilding

Coordinate disposal and prepare the space for the next phase.

Price guide

Demolition safely and transparently budgeted.

The price guide covers non-structural demolition. Containers, disposal, floor level and asbestos surveys are budgeted in advance where required.

WorkPrice guideBasis
Interior strip-outfrom €125–€175 per m²including VATIndicative range for an accessible, empty area
Complete bathroom strip-outfrom €250–€350 per m²including VATIndicative range; final scope follows photos or a site visit
Clarity first, then you decide.

This is an indicative price range, not a quotation. The property, access, structure and selected finish determine the final investment. Send your postcode, requirements and photos. After the site visit you receive a fixed, itemised quote; additional work is only carried out with your approval.

Request a price indication →

A clear route to delivery.

Introduction

Discuss the property, priorities and intended result.

Site visit

Review the existing situation and technical conditions.

Proposal

Set out scope, assumptions and sequence.

Delivery

Coordinate the appropriate trades and quality checks.

Handover

Review and complete the agreed work.

Common questions.

Do you undertake structural demolition?

We assess this case by case. Structural changes require the correct calculations, permissions and specialist delivery.

How do you limit dust and disruption?

We agree protection, access routes, working hours and disposal based on the property and surroundings.

Can demolition form part of a complete renovation?

Yes. This allows preparation, services and rebuilding to follow a logical sequence.

Need a strip-out assessed?

Let us review the situation and intended next phase.

Start your enquiry →

Tell us about your property.

Include the location, current situation and desired result. Photos help us understand the enquiry.

Up to 3 JPG, PNG or WebP photos; 4 MB per photo and 10 MB total.

CallEmailQuote